52.5 MW BUNDLED SMALL HYDRO POWER PROJECT

Price per carbon credit e.g.:

$ 10,00

per tCO2e

ID: 417
Initial Indicative Price: Price per carbon credit e.g.: $10.00 per tCO2e
Registry: Tero Carbon
Methodology: Methodology type e.g.:VM0007 REDD+ Methodology Framework Version 1.6
Geography: Geographic location e.g.:Brazil, states of Acre, Amapá, Amazonas, Mato Grosso, Pará, Rondônia, Roraima, Tocantins, and Maranhão
Type: REDD+, Avoided Planned Deforestation (APD) and Degraded AreaRestoration (RAD)
Project Developer(s): Hdom Engenharia e Projetos Ambientais Ltda
Project Owner(s): Owner name eg.: BATISTA E CIA LTDA
Validator: Laboratório de Manejo Florestal do Instituto Nacional de Pesquisas da Amazônia (LMF/INPA)
General Description: Agropecuária Aruanã, established in 1969 in Itacoatiara, Amazonas, began as a cattle ranching operation on a 12,000-hectare property along the AM-010 highway. Initially, the plan was to use 6,000 hectares for pasture, in accordance with the forestry code for Multiple Use Areas (MUA). After converting 1,500 hectares into pasture, the company voluntarily shifted its focus to reforestation, primarily with Brazil nut trees (Bertholletia excelsa). Now, with approximately 1,400 hectares planted with Brazil nut trees and some additional plots with
species like tonka bean (Dipteryx odorata), Aruanã boasts the largest Brazil nut reforestation project in Amazonas, and possibly in Brazil. The project aims to generate carbon credits through: (a) Avoided Emissions by waiving the right to deforest the MUA (APD) and (b) Removing Emissions by converting pastureland back into forest (RAD).
Sustainable Goals (SDGs): SDG numbers and descriptions e.g.:1 (no poverty), 3 (good health & well-being), 4 (quality education), 7 (affordable clean energy), 12 (responsible consumption & production), 13 (climate action), 15 (life on land) and 16 (peace and justice)
Estimated tCO2e: Emission reduction per annum e.g.:812,538 tCO2e per annum
Available Stock: Available carbon credits (optional if future issuance) e.g.: 50,000 tons
Crediting Period: Time period e.g.:2021 – 2030
Unit: Carbon unit type e.g.:Verified Carbon Unit (VCU)
Storage: Total VCUs estimate e.g.: 8,125,378
Ratings: Project rating e.g.: BBB (BeZero Rating)
Proposed negotiation: Type of negotiation e.g.: Forward Carbon Offset Opportunity
PGEAP Commission structure:
tCO2e ==> tCO2e GEAP comissão por Matchmaking
250.001+ 5,33%
150.001 250.000 6,33%
100.001 150.000 7,33%
200 100.000 8,33%

*Seller pays GEAP commission

Baixar PDF

REF 417 Categoria

Informação adicional

ID

Registro do Projeto

Metodologia

,

Localização

, , , , , , ,

Tipo de Projeto

,

© GEAP - Global Environmental Asset Platform 2024 · Todos os direitos reservados

Top

Fale conosco

Sugestões